This graphic was presented last March, as part of a contract update, showing one of the proposed layouts of the outbound side of Longfellow Bridge. During construction, half of the bridge will be closed at a time, and there will be only one lane of outbound traffic in addition to the sidewalk, bike lane, and temporary T tracks.