The steps and sidewalks in front of the Stratton Student Center are being repaired with fresh concrete, expected to continue until late April. Jessica Liu—The Tech May. 9, 2016 Facebook Twitter Reddit Print The steps and sidewalks in front of the Stratton Student Center are being repaired with fresh concrete, expected to continue until late April. Jessica Liu—The Tech