Students sit atop a plinth in the corner of Lobby 7 as pedestrians walk past on Nov. 5. The Class of ’54 will be holding a student contest for designs to sit atop the pedestals, which were left unfinished after Lobby 7 was built in 1939. Sam Range—The Tech May. 9, 2016 Facebook Twitter Reddit Print Students sit atop a plinth in the corner of Lobby 7 as pedestrians walk past on Nov. 5. The Class of ’54 will be holding a student contest for designs to sit atop the pedestals, which were left unfinished after Lobby 7 was built in 1939. Sam Range—The Tech