A 3D rendering of the new bicycle racks and repair stand outside the Stratton Student Center, Building W20. This view from the southeast corner shows the proposed location of the repair stand, which will be installed in March. The racks go in today. Source: Adam Serafin, Facilities Feb. 27, 2009 Facebook Twitter Reddit Print A 3D rendering of the new bicycle racks and repair stand outside the Stratton Student Center, Building W20. This view from the southeast corner shows the proposed location of the repair stand, which will be installed in March. The racks go in today. Source: Adam Serafin, Facilities