Damage following the October 31 steampipe break in Building 66 can be seen in the Chemical-Biological Engineering teaching labs. The reported repair cost is in the millions of dollars.
Damage following the October 31 steampipe break in Building 66 can be seen in the Chemical-Biological Engineering teaching labs. The reported repair cost is in the millions of dollars.
Chelsea Grimm—The Tech