The Tech
Home
News
Opinion
Arts
Sports
Campus Life
Science
About Us
Past Issues
Photos
Policies
Advertising
Sponsors
Donate
Our Staff
Join The Tech
Contact Us
Facebook
Twitter
photos
Volume 146, Issue 15 — 12 photos
‹
›
A rendering of the renovation of Building 39 by HGA Architects. The renovation is expected to finish in early 2028.
Photo courtesy of HGA
A picture of me lighthouse-keeping.
Jojo Placides–The Tech
The Met Warehouse (Building W41) opens as a new hub for the School of Architecture and Planning. Saturday, Sept. 12, 2026.
Levy Le–The Tech
A rendering of the renovation of Building 39 by HGA Architects. The renovation is expected to finish in early 2028.
Photo courtesy of HGA
Members of the GSU gather on Wednesday, Sept. 9, 2026, in preparation of a potential strike if a bargaining agreement is not reached.
Photo provided by Lauren Chua/MIT GSU
The School of Architecture and Planning advertises opening events for the Met Warehouse on a poster outside the Sidara Auditorium. Friday, Sept. 11, 2026.
Levy Le–The Tech
Members of the GSU protest proposed changes to MIT SHIP among other key issues outside of Lobby 7 on Thursday, Aug. 6, 2026.
Photo provided by Lauren Chua/MIT GSU
The Met Warehouse (Building W41) opens as a new hub for the School of Architecture and Planning. Saturday, Sept. 12, 2026.
Levy Le–The Tech
The Boston Ballet perform Akram Khan’s ‘Vertical Road (Reimagined) 2023’ for their Fall Experience at Citizens Opera House. Sept. 2026.
Photo courtesy of Theik Smith/Boston Ballet
The Boston Ballet perform Akram Khan’s ‘Vertical Road (Reimagined) 2023’ for their Fall Experience at Citizens Opera House. Sept. 2026.
Photo courtesy of Theik Smith/Boston Ballet
The Boston Ballet perform Alexander Ekman’s ‘Cacti’ for their Fall Experience at Citizens Opera House. Sept. 2026.
Photo courtesy of Rosalie O’Connor/Boston Ballet
Weather
Conrad Straden–The Tech
All Photos